|
|
The start of the base
|
|
|
Base in progress - 18mm exterior plywood with underfloor insulation and dpc. |
|
|
A completed base ready for the walls to go up. |
|
|
The walls start to go up. |
|
|
Cavity walls, keeping you warm in the winter and cool in the summer. All wires are hidden in the cavity. |
|
|
A 5.0m x 4.0m building under construction |
|
|
A tiled roof. |
|
|
All our windows are hardwood double glazed anti UV reflective and are built to European standards. The windows on the Small/Medium and Large buildings have security bars fitted as standard. |